Show Connected Conduits in Profile

The ability to show the cross-pipes in profile runs right now is by default a user preference. It would be nice if this could just be a standard function or at least set to "True" as a default to be turned off if desired.
about 2 years ago in Drainage and Utilities 0 Future consideration

Circular Eccentric Nodes should have the ability to have a rotation point at the center of the structure.

Circular eccentric nodes, like manholes, should have the ability to have a rotation point at the center of the structure and elevation reference at the center of the frame and cover.
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

ORD Drainage - Separate CUlverts and Storm Sewer Pipes into Completely Separate Design Windows

Having to click 'Is Culvert' is just one more placve an error can take place in design. Creating spearate design windows for each of these elements will minimize this potential, and will make it easier for reviews as well.
almost 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

ORD DU File Recovery Tools

ORD DU File recovery tools would be extremely handy when dealing with support issues. I've had to deal with a support ticket where the file is crashing upon opening several times now, and being able to run some tools outside of ORD would be extrem...
over 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 3 Future consideration

ORD Drainage - Show actual Tc versus Tc Minimum

Many times a calculated Time of Concentration is less than the minimum used for Intensity. When this occurs in a system of drainage areas (catchments), it helps a designer AND a reviewer to see what the actual Time of Concentration is at a given p...
almost 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Ablity to connect two nodes directly by flange

For the water supply project, in a situation where we have cast iron elements connected to the flange such as gate valves, hydrants, elbows, venturiers and plastic line pipes. There is no way to connect the two nodes directly through the flange. a...
over 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Utility Enhancements

Add the conduit table options similar to drainage for managing conduit sizes, materials, etc... Right now you have to input a conduit table for each utility type and can't import a table from utility to utility. Just need one set of tables to mana...
over 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer / Workspace 0 Future consideration

Add profile annotation location option for annotating conduit description only once

If a conduit is perfectly straight, then it is easy to put the description once in the middle, but if the conduit has any bends then each segment gets annotated. Adding an option for annotation frequency with location controls would fix this.
over 2 years ago in Annotation / Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Needs ability to set RIM Depression Depth

Needs ability to add RIM Depression Depth with elevation (ground). Currently we can only set the Elevation (RIm) but not any depression value.
over 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 1 Future consideration

DU RIM Elevation calculated from Ground Elevation offset

The RIM Elevation is a stagnant number once you enter an elevation it does not update in relation to any surface changes. RIM Elevation would be better suited for use if it can be defined with an offset. Another field would be needed: RIM Depressi...