Drainage and Utilities

Showing 62

Ablity to connect two nodes directly by flange

For the water supply project, in a situation where we have cast iron elements connected to the flange such as gate valves, hydrants, elbows, venturiers and plastic line pipes. There is no way to connect the two nodes directly through the flange. a...
about 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Openroads Drainage - HGL versus Headwater Analysis for Headwalls Inletting into a Storm Sewer System

Many times, a stream needs to be drained into a storm sewer system via a headwall. When this occurs, two analysis should be considered: The headwater at the headwall (the mechanics of the water getting into the pipe at the headwall). Generally KYT...
almost 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Utility Enhancements

Add the conduit table options similar to drainage for managing conduit sizes, materials, etc... Right now you have to input a conduit table for each utility type and can't import a table from utility to utility. Just need one set of tables to mana...
about 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer / Workspace 0 Future consideration

Add profile annotation location option for annotating conduit description only once

If a conduit is perfectly straight, then it is easy to put the description once in the middle, but if the conduit has any bends then each segment gets annotated. Adding an option for annotation frequency with location controls would fix this.
about 2 years ago in Annotation / Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Add the ability to place banks of conduits.

Electrical and Communications conduits are usually placed in banks of multiple conduits of say 12 conduits which may be of different sizes.
almost 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Needs ability to set RIM Depression Depth

Needs ability to add RIM Depression Depth with elevation (ground). Currently we can only set the Elevation (RIm) but not any depression value.
over 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 1 Future consideration

DU RIM Elevation calculated from Ground Elevation offset

The RIM Elevation is a stagnant number once you enter an elevation it does not update in relation to any surface changes. RIM Elevation would be better suited for use if it can be defined with an offset. Another field would be needed: RIM Depressi...
over 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer / User Interface 0 Future consideration

Calculation Summary ("Report") Improvement Suggestions

The calculation executive summary and calculation detailed summary would be improved by adding a time stamp near the date and file name at the bottom of the reports' pages. It would be helpful to be able to add a note to the reports describing tha...
5 months ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Make Grips Visible and Useable on 4k displays

When using Grips for Structures and Pipes - the grip blends too much into the background color, and on a 4K screen is TINY. The pipe grip is annoying to select (it only appears when I select the centerline of the pipe) but when adjusting or swapin...
about 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer / User Interface 1 Future consideration

Add report for information about pipe bends

Kindly add a non-graphical way of identifying whether a pipe contains bends or not and information about the coordinates. The report is required to produce pipe setting out schedules and share the coordinates with the contractor. It would be...
about 1 year ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration