Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Applications

Showing 1026

Calculation Summary ("Report") Improvement Suggestions

The calculation executive summary and calculation detailed summary would be improved by adding a time stamp near the date and file name at the bottom of the reports' pages. It would be helpful to be able to add a note to the reports describing tha...
9 days ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Product Alignment of file vs File Schema - Need better compatibility between platform products in the same generation/schema

Please update the OpenX product(s) so that any DGN can be opened for editing no matter what product authored the file as long as it remains in the same Major schema version Suggest any DGN can be opened by any product (Site/Rail/Road/Bridge) regar...

ORD Seeding Reports Like GEOPAK

Ohio DOT would like the ability to create Seeding Reports like those that could be generated within GEOPAK from the cross section candidate elements (or components) with their end width (slope lengths) including similar options that GEOPAK offered...
over 1 year ago in OpenRoads Designer / Reports 1 Future consideration

Rename terrains, linear templates, surface templates and other elements by selecting from Explorer list>(right click) Properties

At the current OpenRoads version, we need to select the terrains at 3D view then click properties in order to rename. It would be better if it can be renamed just by selecting the terrain name from Explorer list>(right click) properties.
almost 2 years ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Terrain 0 Future consideration

Ability to create XS from Line String (more than 2 points)

Add ability to create XS by selecting multiple Line String containing more than 2 points.
about 2 years ago in Drawing Production / OpenRail Designer / OpenRoads Designer 1 Future consideration

Parametric capability for the placement of Node and Conduit feature definitions

This would dramatically reduce the requirement for a vast number of library cells and feature definitions to be created
almost 2 years ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 1 Future consideration

[Terrain] Flow arrows with slope percentages

Need ability to toggle slope percentage annotations above/below the flow arrows on terrains. This will help with design and analysis. An option could be added in the flow arrow properties, please refer to the attached snapshot.
6 months ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Terrain 1 Future consideration

Allow Cross Section Navigator to work in read-only mode

The XS Navigator tool's full functionality is contingent upon users having file read/write access. This requirement seems excessive for reviewers who primarily need read-only access. I suggest revising the tool to accommodate reviewers with read-o...
5 months ago in OpenRail Designer / OpenRoads Designer / User Interface 0 Future consideration

Add Process Button to "Corridor Objects" Dialog

It would be helpful to have a process corridor button in the corridor objects dialog. That way a user could remove rules, make edits to templates, point controls and parametric constraints then turn the rules back on and reprocess.
about 2 years ago in OpenRail Designer / OpenRoads Designer / User Interface 1 Future consideration

Ability to Delete specific Annotation group instance instead of all instances

Currently users need to remove all annotation per drawing or in all drawings with no control. An additional "Delete Drawing Annotation" with the same options as the annotate drawings one but with an additional "All Drawing Annotation Groups" optio...
about 2 years ago in Annotation / Drawing Production / OpenRail Designer / OpenRoads Designer 1 Future consideration