Currently when profiling a Utility (nodes and conduits), the lines on the nodes and conduits are "closed". Old Inroads Storm/Sanitary had open connections. Agency we submit the plans want us to show that connection as open. Only option at the moment is redrawing on top of the nodes and clip the openings which is not productive especially when we are on design stage. (eg. have to redraw after changing inverts or moving structures). A handful of nodes and conduit is bearable. Not so much when we deal with 20+ nodes in a network.
Civil Product Used | OpenRoads Designer |
Thanks Neil - that's useful.
below is sample drainge run from old inroads storm and sanitary.
Can you attach a screen capture please, showing the result that you would like? Thanks!