It would be helpful to have a process corridor button in the corridor objects dialog.
That way a user could remove rules, make edits to templates, point controls and parametric constraints then turn the rules back on and reprocess.
Civil Product Used | OpenRoads Designer, OpenRail Designer |
Add sync template button as well.