Deck Elevation at Coping Break Back Points

OBM has the option to create a deck elevation report parallel to start of the support or normal to the alignment. Bentley should include the option to find the elevation and station of the bent traverse line to not intersect with the railing lines...
20 days ago in OpenBridge Modeler / Reports 0 Future consideration

Add option to save result as a "Report" when performing a Terrain to Terrain (or pane) Volume analysis.

Currently when performing a Terrain to Terrain (or pane) Volume Analysis, the only option for saving the result is to save it as a text string and place in a .dgn. It would be very helpful if there was an option so save this result as a report (id...
22 days ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Reports 0 Future consideration

Separate geometric ratios summary from stress ratio summary

OpenBridge LEAP Steel Summaries include geometric ratios (like 6.10.7.3-1) together with stress ratios. This is not helpful, as that ratios is not a real demand/capacity ratio, therefore when that geometric value of "performance ratio" is high, it...
about 1 month ago in OpenBridge Designer / Reports 0 Future consideration

Vertical curves/kvalues to report direction as positive/negative

Handing of vertical curves in reports/table editor is always positive in the reports. Geometry exports are used by Construction Teams, as part of the Approved for Construction design pack. Horizontal curves have a handing convention - +ve = RH cur...
about 2 months ago in OpenRail Designer / Reports 1 Future consideration

Add Input Reports for LARS CONNECT Edition

An input report should be made available to LARS files similar to the input report generated in LEAP Steel. This allows for a more efficient process for QA/QC of load rating files. This ability was present in LARS v10, but removed in the modernize...
2 months ago in OpenBridge Designer / Reports 0 Future consideration

Update the Check Integrity Reports to include both the Start and END stations of the elements.

The current report has the Start station, but it would be nice to have the Ending station of the individual elements included as well.
4 months ago in OpenRail Designer / OpenRoads Designer / Reports 0 Future consideration

Export Civil Report to csv

We're using ORD version 2023, and the Civil Reports browser allows us the option to export to xml, html, doc, and xlsx file formats. We used to have a function that allowed us to save as a txt file, which we could change the extension to csv so it...
5 months ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Reports 0 Future consideration

Report Station Equations in Horizontal Alignment report similar to GeoPAK

Horizontal geometry reports are confusing when there are station equations at cardinal points. A few of our surveyors have commented on this and I can see where they’re coming from. I’ve attached three example geometry reports. Their names ind...
5 months ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Reports 0 Future consideration

Lift/Lower/Slue Report

Lift/Lower/Slue Report is missing and needs adding back in as we had in PowerRail Track
5 months ago in OpenRail Designer / Reports 0 Planned

Gauge and Cant Reports on Regression Information

Based on the way the new regression tools work for importing regression lines we no longer have a way of running gauge and cant reports on existing alignments based on LHR/RHR surveys.
5 months ago in CANT / OpenRail Designer / Regression Analysis / Reports 0 Future consideration