Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

OpenRail Designer

Showing 963

Restrict limits of unsuitable removal to only within grading limits

See this thread from the Bentley OpenRoads Community: https://communities.bentley.com/products/road___site_design/f/geopak-inroads-mx-openroads-forum/226295/ord-2021-r2-limits-of-unsuitable-removal
over 2 years ago in Modeling / OpenRail Designer / OpenRoads Designer / OpenSite Designer 3 Future consideration

Make the Drainage Catch Basin Grate Perimeter and Open Area variables reportable

Some DOTs require input of an exact values for catch basin grate open area for orifice flow and catch basin grate perimeter for weir flow. ORD would consider these as calculated values, not inputs. These are not ORD outputs and are hidden from the...
25 days ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer 0 Future consideration

Drawing Model Optional

Creation of the drawing Model is Optional in sheet production in MicroStation. I believe this should be true for civil Plan as well. We should be able to create a drawing seed that does not have the option ON for creating drawing. Most of the Plan...

Draw railway scheme in the annotation

We need that when writing down the singular points of a railway deviation (P0, P1, P2 and P3), they are joined by straight lines P1 with P2 and P0 with P3. See attached image. In fact, the V8i version did represent the detour scheme. Thank you!
over 1 year ago in Annotation / OpenRail Designer 0 Future consideration

Allow for Densify Horizontal Value and the Densify Vertical Value fields unlocked in order to give more user control to corridor stroking

We need improved stroking control for corridors. Currently stroking for corridors is defined by configuration variables i.e. CIVIL_DEFAULT_CURVE_STROKING and CIVIL_DEFAULT_PROFILE_STROKING, for horizontal and vertical curves respectively, which ta...
over 2 years ago in Modeling / OpenRail Designer / OpenRoads Designer 6 Future consideration

Deed Writer Tool Enhancement to Allow for Phrase Inserts in Specific Cursor Location to Create Nested Phrases

Please consider adding the ability for a user to insert a phrase within a phrase in the Right of Way Deed dialog box when using the Deed Writer tool based on the cursor location in the white text deed description box. This capability would give th...
8 months ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Survey 0 Future consideration

ESRI ArcGIS import automatically handle unit conversions

We would like to see the ESRI ArcGIS import functionality enhanced to handle conversions on the fly without having to change the working units of the file. To provide context, we have a base DGN that has working and storage units for SVFT/SVIN. Th...
over 2 years ago in Import/Export / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Deed Writer Tool Enhancement to Control Decimals on the Line Bearing Phrase Calculated Insert

Please consider adding the ability for the user to control decimals on the Line Bearing phrase calculated insert in the respective .xml when using the Deed Writer tool. Users would like to have control on the Line Bearing number of decimals. For e...
8 months ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Survey 0 Future consideration

Deed Writer Tool Enhancement to Bold Items from the Segments Column Once Added to the Phrases Included Column of the Right of Way Dialog Box

Please consider bolding items from the Segments column once added to the Phrases Included column of the Right of Way Deed dialog box that opens when using the Deed Writer tool. This will help users track progression of the deed description develop...
8 months ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Survey 0 Future consideration

Deed Writer Tool Enhancement to Allow User to Scroll (Up-Down) in Areas of the Right of Way Dialog Box

Please consider adding the ability for the user to scroll (up-down) in the following areas of the Right of Way Deed dialog box that opens when using the Deed Writer tool; Segments column, Inserts column, Phrases Included column, and the white text...
8 months ago in OpenRail Designer / OpenSite Designer / Survey / User Interface 0 Future consideration