For the water supply project, in a situation where we have cast iron elements connected to the flange such as gate valves, hydrants, elbows, venturiers and plastic line pipes.
There is no way to connect the two nodes directly through the flange.
and if we try to create a SUDA cell of combined nodes, There is a issue with the extraction solid element between the top and bottom cell.
Civil Product Used | OpenSite Designer, OpenRoads Designer, OpenRail Designer |