Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Automate the creation of plan-plan sheets with different views of the same station range.

We often do sheets where the same station range is shown, plan on top and bottom, but they have different information. For instance, the top plan view might be a staking overview where the bottom plan might be a jointing diagram. Both have the sam...
over 3 years ago in Drawing Production / OpenRail Designer / OpenRoads Designer / OpenSite Designer 6 Future consideration

Inherit survey point name and code to regression point

When we import survey points into Survey and create a field book, we get the name and code for the point. However, if we want to use the survey points directly from the Field Book in Survey to use as regression points, we don't get the name and co...
almost 2 years ago in OpenRail Designer / OpenRoads Designer / Regression Analysis 0 Planned

New Survey Linear Name

The create new survey linear tool needs to have the ability to name the element and set the field code. Currently, you have to select the new linear and enter the name and field code in the properties after it's created.
almost 4 years ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Survey 1 Future consideration

Named Key Station

Key Station is defined as a station of an alignment, and additional information can't be added. I think it would be great to able to assign a name to the Key Station and use this name in the other modelling that requires station inputs. This will ...
almost 3 years ago in OpenRail Designer / OpenRoads Designer 0 Future consideration

Need ability to include General Project information in the IFC

This is the Feature Request to support the ability to include General Project information in the IFC. We would like to add several user-defined attributes to the IFC Site level, including "Organization Name", "Project Address", "Project Issue Date...
almost 3 years ago in Import/Export / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Item Types for Parametric cells

Users are asking for item types for Parametric cells. Primarily for quantities reports.We tag each element, but can we expose volumes for each element in a Parametric cell. The most important things are Volume, Surface Area, Length(Column, Pile, C...
about 4 years ago in Modeling / OpenBridge Designer / OpenBridge Modeler 0 Planned

Including OverBridges, Noise wall and Large Gantries for Sight distance analysis

For the sight distance analysis, it would be good to include more complex scenarios, like OverBridges, noisewalls, Large Signage Gantries etc. which cannot be included in composite design surfaces.
almost 4 years ago in All Other / OpenBridge Designer / OpenBridge Modeler / OpenRail Designer / OpenRoads Designer / OpenSite Designer / OpenTunnel Designer 1 Future consideration

Apply Surface Templates perpendicular to slope of a terrain

surface templates apply depth vertically, in many cases it is desired a true depth that is perpendicular to the terrain.
about 1 year ago in Modeling / OpenRail Designer / OpenRoads Designer / Terrain 0 Future consideration

Improve and simplify the named boundary drawing/sheet seed creation workflow

The way it is now, It's just too complex to create and custum the seeds for each client. Too many files, too many things to control and in too many folders/.cgf. You have to create many seeds with different specifics for each sheet size/scale/plan...
over 3 years ago in Drawing Production / OpenRail Designer / OpenRoads Designer / OpenSite Designer / Workspace 0 Future consideration

Standardized functionalities across similar dialog boxes

Introduce standardized functionalities across similar dialog boxes. For example, the Target Alias dialog allows you to directly select terrains whereas the Create Complex Terrain Model dialog has a button to use Selection Set. The dialogs should h...
over 1 year ago in OpenRail Designer / OpenRoads Designer / User Interface 1 Future consideration