Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Functional Areas

Showing 1194 of 1416

migration tool for workspaces

a Migration Tool for 10-10 to 10-11 workspaces.(or any time a new workspace category is created ie. 10-10, 10-11, 10-12...) Something that can find and copy the modifications made to the 10-10 workspace to suit our particular standards (cells, dgn...
almost 2 years ago in Workspace 0 Future consideration

3d measure between any to points.

I have used a 3d measure macro in Microstation for 20 years now. I love it. It would be nice to have this feature in ORD . Would be simple to add. The way the tool would work: Users snap between any two points. I dialog would pop up displaying the...
almost 2 years ago in Modeling / OpenBridge Designer / OpenBridge Modeler / OpenRail Designer / OpenRoads Designer / OpenSite Designer / OpenTunnel Designer 0 Future consideration

Earthwork Quantity Cell table for Cross Sections

We currently only have the ability to produce Cut & Fill volume quantities using available text favorites for our cross sections. That's where it ends when it comes to extracting quantities from the model to display in the drawing/sheet models...
almost 2 years ago in Analytics / Drawing Production / Item Types / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Future consideration

Corridor Modeling for 90 degrees corners

In modeling the road or site with geometry corner in 90 degrees or sharp, the small arc of corner is required in order to model the round corner. So that no overlap between 3d linear geometry. Software should provide the option to allow the corner...
almost 2 years ago in Modeling / OpenRail Designer / OpenRoads Designer / OpenSite Designer 2 Future consideration

Survey Media Files

Currently Survey Media files can only be viewed in the dgn file with the fieldbook. Can we get an enhancement to view photos when the survey fieldbook file is referenced to another file.
about 1 year ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Survey 0 Future consideration

Ability to Have Item Types Dynamically Interact with Spreadsheet

We have built item types and a spreadsheet for title block management. It works, but with some issues that may be easy to solve. We are running excel spreadsheets for plan set management and looking to stream line the process. The spreadsheet has ...
about 2 years ago in Drawing Production 0 Future consideration

Automate the assignment of a node's sump offset based on largest connecting pipe's wall thickness

We are looking for a workflow where the Sump depth value can be set to the thickness of the "largest pipe" connected to a node. When the user places a node, if there is an option to set the sump depth to the thickness of the pipe, then it would au...
10 months ago in Drainage and Utilities / OpenRail Designer / OpenRoads Designer / OpenSite Designer 0 Needs review

Auto Create Event Points at Drainage Nodes

CTDOT would like the ability to create event points from Drainage Nodes. Many of our projects have a lot structures and manually adding event Points at each crossing is tedious. Projecting drainage on XSCs still does not work like we need it to, s...
about 1 year ago in Drainage and Utilities / Geometry / OpenRail Designer / OpenSite Designer 1 Planned

Add a position tick mark to the Survey Decorators

Inroads allowed the user to toggle a tick mark, such as a plus symbol (+), to show the position of any survey point in the fieldbook. Very useful. ORD allows the toggling of many different attributes of a point by using Survey Decorators. Please a...
almost 2 years ago in OpenRail Designer / OpenRoads Designer / OpenSite Designer / Survey 0 Future consideration

Add regression report tool for reporting against a control alignment

In Bentley Rail Track you could run a "Regression" report via Tools - XML Re ports - Regression... This was an invaluable way of reporting existing cants, sixfoots, etc. with the figures generated in line with a 'Control Track'.
about 2 years ago in Reports 1 Future consideration